AGRICULTURE · WESTERN CAPE

Agricultural Operation

R720,000Annual savings delivered

The Challenge

A Western Cape farming operation faced escalating electricity costs and frequent load-shedding disruptions that threatened irrigation schedules, cold storage, and daily operations. They needed energy independence without taking on significant financial risk.

Our Solution

We designed and installed a solar PV system with battery energy storage, sized to cover peak demand and provide backup during load-shedding. The system was financed through a savings-share model, meaning the farm paid nothing upfront.

The Results

  • R720,000 in annual energy savings
  • Complete elimination of load-shedding disruptions
  • Energy independence for critical irrigation and cold storage
  • Zero upfront capital investment

Key Metric

R720,000
Annual savings delivered

Case Study Asset

Download the full technical breakdown and implementation data for this project.

Sector

AGRICULTURE
WESTERN CAPE

Get Similar Results

Find out how much your business could save with a free utility audit.

Book Free Audit

Project Gallery

Agricultural Operation — 1
Agricultural Operation — 2